National Repository of Grey Literature 19 records found  1 - 10next  jump to record: Search took 0.01 seconds. 
Solution of some rock stability problems in slopes and walls with optimization of anchor elements
Holý, Ondřej ; Vojtasík,, Karel (referee) ; Pruška, Jan (referee) ; Horák, Vladislav (advisor)
This presented phd thesis focuses on the problems of instability in the rock walls and slopes, whose manifestation is among othersv rockfall and associated risks. It describes the theoretical aspects of the description of instability and summarizes the construction methods and technologies to eliminate them. On the basis of knowledge gained from specific buildings in the Czech Republic and based on the research project solved by author, submits suggestion to optimimalization of the anchoring elements as a basic part of most remediation methods.
Prerequisites and Facts wi the GT Monitoring on the Višňové-tunnel in Slovakia.
Horňáková, Michaela ; Černý,, Vít (referee) ; Horák, Vladislav (advisor)
The bachelor´s thesis is divided to two main parts, from which first is focused on the theory of geotechnical monitoring. The second, practical part deals with tunnel Višňové in the north of Slovakia. It processes the history and technology of construction, geomorphology and geotechnical monitoring, which was approved for tunnel. Finally on the few profiles compares real geotechnical conditionals with prerequisites from exploration gallery.
Solution of some rock stability problems in slopes and walls with optimization of anchor elements
Holý, Ondřej ; Vojtasík,, Karel (referee) ; Pruška, Jan (referee) ; Horák, Vladislav (advisor)
This presented phd thesis focuses on the problems of instability in the rock walls and slopes, whose manifestation is among othersv rockfall and associated risks. It describes the theoretical aspects of the description of instability and summarizes the construction methods and technologies to eliminate them. On the basis of knowledge gained from specific buildings in the Czech Republic and based on the research project solved by author, submits suggestion to optimimalization of the anchoring elements as a basic part of most remediation methods.
Prerequisites and Facts wi the GT Monitoring on the Višňové-tunnel in Slovakia.
Horňáková, Michaela ; Černý,, Vít (referee) ; Horák, Vladislav (advisor)
The bachelor´s thesis is divided to two main parts, from which first is focused on the theory of geotechnical monitoring. The second, practical part deals with tunnel Višňové in the north of Slovakia. It processes the history and technology of construction, geomorphology and geotechnical monitoring, which was approved for tunnel. Finally on the few profiles compares real geotechnical conditionals with prerequisites from exploration gallery.
Authentication of real rock mass field voltage to increase safety in anomalous stress states
Koníček, Petr ; Staš, Lubomír ; Ptáček, Jiří ; Kaláb, Tomáš ; Chura, Jan ; Souček, Kamil ; Waclawik, Petr
Voltage fields are one of the key factors that, decisively, along with the mechanical and remodeling properties of rocks, greatly influence the behavior of the mountain massif. Knowledge of stress fields is beneficial for the design and successful implementation of geotechnical underground projects (eg for the assessment of the stability of underground spaces, the behavior of proposed reinforcements of underground structures, for space-time placement of underground structures) especially in non-trivial geomechanical conditions, both in terms of natural factors affecting stress fields structural and geological structure of the rock mass, tectonic stress, cracks and discontinuity in the rock mass) as well as anthropogenic factors (geomechanical configuration of the underground spaces and dynamics of their changes). Geotechnical practice in our (Czech) conditions is usually used only calculations of a voltage field based primarily on the theoretical behavior of the rocks and the assumed vertical geostatic pressure at a given depth. The development of possible progressive deformations of the stress field is then derived from the development of anthropogenic interventions into a relatively homogeneous massif. In fact, tension is also affected by close geological structures. The data obtained from the study of the magnitude, direction and change of stress in the mountain massif are a significant contribution in mathematical modeling where they can be used as input parameters to obtain a more accurate picture of the behavior of mountain massifs and underground structures in the subject areas.
Final Report - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor-a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Ptáček, Jiří ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report V/2016 (Waclawik et al. 2016). Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.
Partial Report V/2017 - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor-a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report IV/2016 (Waclawik et al. 2016) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.\n
Fulltext: Download fulltextPDF
Underground research site Bukov - geotechnical characterization of the site
Souček, Kamil ; Vavro, Martin ; Vavro, Leona ; Staš, Lubomír ; Georgiovská, Lucie
Podzemní výzkumné pracoviště Bukov (PVP) je navrženo jako testovací lokalita pro zhodnocení vlastností a chování horninového masivu, typově blízkého vybraným kandidátním lokalitám, v hloubce odpovídající předpokládané úložné hloubce finálního hlubinného úložiště vysoce aktivních odpadů v České republice. PVP Bukov, jehož výstavba byla zahájena v roce 2013, je realizováno v jižním křídle uranového ložiska Rožná, na severovýchodním okraji strážeckého moldanubika, poblíž jeho styku se svrateckým krystalinikem. Důlní díla pracoviště jsou situována na 12. patře jámy Bukov-1, v hloubce přibližně 600m pod povrchem.
Fulltext: content.csg - Download fulltextPDF
Plný tet: UGN_0465530 - Download fulltextPDF
Partial Report IV / 2016 - Rating of the deformation stress monitoring the state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH
Waclawik, Petr ; Ptáček, Jiří ; Kukutsch, Radovan ; Kajzar, Vlastimil ; Koníček, Petr ; Souček, Kamil ; Staš, Lubomír
Monitoring of the deformation stress state of the rock mass is a prerequisite for the verification of unapproved new mining methods hall-pillar and its further application in the Czech part of the Upper Silesian coal basin. This mining method is designed on the basis of experiences and practices that are verified in different natural conditions and depths below the surface and is therefore essential for the verification of conditions for the Czech part of the Upper Silesian Basin based on geotechnical monitoring. The present report is prepared on the basis of a contract no. 942/50/10, where the Institute of Geonics, v.v agrees to make periodic evaluation of monitoring data napěťodeformačního state of the rock mass. In accordance with the aforementioned agreement, the message is processed in the six-month period and continues in the interim report III / 2015 (Waclawik et al. 2015) passed buyers in April this year. Interim results of the geotechnical monitoring, such as the experience gained during the first conquest dobývky V show specifics of natural conditions in trial operation unapproved new mining methods hall-pillar.
Fulltext: content.csg - Download fulltextPDF
Plný tet: UGN_0464907 - Download fulltextPDF
Monitoring project of the deformation stress state of the rock mass during mining coal seam 30 (634) within the trial operation of mining method corridor - a pillar in OPJ ČSM - NORTH - Quarrying II
Waclawik, Petr ; Koníček, Petr ; Ptáček, Jiří
This is a project monitoring of the deformation stress state of the rock mass during mining decant no. 30 (634) within the trial operation of new methods corridor - a pillar in the protective pillars jam CSM Mine, site Sever

National Repository of Grey Literature : 19 records found   1 - 10next  jump to record:
Interested in being notified about new results for this query?
Subscribe to the RSS feed.